top of page
![2S0A3730-4.jpg](https://static.wixstatic.com/media/335f0c_bfec4bcb85f646819056d3c678bd294d~mv2.jpg/v1/fill/w_122,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/335f0c_bfec4bcb85f646819056d3c678bd294d~mv2.jpg)
Design Builds
Memorial Northwest
Progressive Commercial Aquatics
Progressive was contracted by Memorial Northwest as a Design Builder to perform a complete overhaul of the HOA's aquatic facility. The $4.3 million investment funded a complete replacement of the 50-year-old pool. The project consists of a new 4,750-square-foot competition pool with eight 25-yard lap lanes. It also includes a 7,000-square-foot leisure pool with zero-depth entry, three stair entries, underwater benches, a water walk, play structure, various spray features, and a waterslide. The new filter plant was also designed and built by Progressive Commercial Aquatics.
bottom of page